BHPBilliton Iron Ore Pty Ltd
Supersite Relocation Project
Project Management, Project Engineering and Design Engineering
Relocation of wayside condition monitoring equipment to new site.
Installation of new wayside equipment, 11kV Transmission line extension, Optic Fibre spur and new equipment room.
High Speed in-motion weighbridges, Wheel Impact Load Detectors (WILD), Rail Bearing Acoustic Monitor (RAILBAM), Video Imaging systems monitoring ore cars and locomotives - wheels, brakes, bogies and structure.
O’Donnell Griffin Rail
Mainline Signalling Upgrade and Solomon Spur ITCS Project - GETS / Fortescue Metals Group Ltd
Project Engineering of Signalling and Communications. Team Management, Subcontractor and Vendor Management. 100+ Sites.
O’Donnell
Griffin Rail
Rapid
Growth Project 5 - BHPBilliton Iron Ore Pty Ltd
27.8km Asset Protection Site ("Supersite")
Design, Vendor
Design Management, Project Management, Site Management, Training and handover.
Three new
trackside shelters with UPS Essential Power System
Addition of West Track Systems (Video Imaging, High-Speed Weighbridge, Wheel
Impact Load Detection, RailBAM) and relocation of HBD/HWD.
Relocation
of HBD/HWD, RailBAM and Weighbridge Systems for East Track
Department of Planing, Transport & Infrastructure
(DPTI) formally DTEI, South Australia
Rail Revitalisation and Electrification.
Providing
technical advice and design input on Communication Systems and Traction SCADA
(in Partnership with JComm Engineering)
Public Transport Authority of WAPerth City Link - Rail Project
Involved
in the design and project management of communication/systems
engineering aspects Forward Works Packages.
Concept
Designs for design input into the Perth City Link - Rail Project Alliance in
partnership with MHM Engineering.
Public Transport Authority of WA
Alternate Train Control
Involved
in design input and project management in partnership with MHM Engineering.
Fluor SKM
Iron Ore Joint Venture
Rapid
Growth Project 5, 6, Quantum 1/2 - BHPBilliton Iron Ore Pty Ltd
Engineering
Management for Rail in the design RGP5 – Yandi 1 to 2 line, Jimblebar
Junction to Homestead Junction Track Duplication .
Engineering
Management for Rail in the Selection Phase Studies RGP6 – Dumper/Train
Automation, Orebody 25 to Newman Track Duplication, Jimblebar Junction to
Jimblebar Hub Track Duplication, Jimblebar No2 Loop, BHPBilliton Iron Ore’s
future Signalling Strategy and. Central Pilbara.
Mining
& Port Developments JV (MPDJV)
Rapid
Growth Project 4 - BHPBilliton Iron Ore Pty Ltd
Involved
in the communication engineering aspects of the Railroad
project
Jimblebar
Loop, Jimblebar Loadout & Jimblebar Mine.
The
Pilbara Iron Ore and Infrastructure Project
Fortescue Metals Group Limited
Involved
in the project communication engineering aspects of:
- Construction
Telephony, Data and Land Mobile Radio
- Permanent
Signalling & Communications
New MetroRail Project
Public Transport Authority of WA
Involved
in the project communication engineering aspects of:
Nowergup
Depot
Including
Nowergup Communications Room & Nowergup Drivers Sign On Building
Perth
to Nowergup
Including Clarkson,
Currambine & Greenwood Stations works: station SCADA, station
telephony, station CCTV/PA, station information systems, station ticketing,
station electrical, bearer extensions/relocations, mobile radios, microwave
link relocation
Perth
Yard
Relocation
of communications copper and fibre cables, location cases and Crank Handle
telephones in preparation for Southern Suburbs Railway.
Perth to Thornlie
Including
Kenwick Tunnel, Kenwick Tunnel Shelter, Thornlie Station and changes at
existing sites including Kenwick Relay Room
Southern
Suburbs Railway (Perth to Mandurah Railway)
Including new stations at William St, Esplanade, Canning Bridge, Bull Creek,
Murdoch, Cockburn Central, Kwinana, Wellard, Rockingham, Warnbro, Mandurah;
Mandurah Depot; Mandurah Depot Communications Room;
Standalone Equipment Rooms such as Mandogalup, Anketell Tunnel, Stakehill,
Karnup, Lakelands; changes to existing sites. |